Reconstruction of the 110 kV switchyard of the HPP Doblar

Power plants

Reconstruction of the 110 kV switchyard of the HPP Doblar  

Reconstruction of the 110 kV switchyard of the HPP Doblar

Scope of works:

  • Supply and installation of high-voltage (HV) cable systems and GIS switchgear,
  • Supply and installation of protection and control cabinets,
  • Supply and installation of auxiliary power supply and DG (Diesel Generator),
  • Supply and installation of telecommunication equipment,
  • Parameterization, Factory tests (FAT), site tests (SAT),
  • Commissioning.

Implementation year: Project in progress  

Investor:  

Soške elektrarne Nova Gorica d.o.o. and ELES, d.o.o.