Distribution transformer substation Ivančna Gorica

Distribution transformer substation Ivančna Gorica

Distribution cilities

Distribution transformer substation Ivančna Gorica

Construction of new distribution transformer substation in Ivančna Gorica

Contract was signed in

2019 

 

Scope of work

•Construction works
• Supply of primary equipment
• Electrical installation works
• Assmebly, supply, mounting and instalaltion of secondary equipment cases for 110 kV and 20 kV switchyards
• Supply of auxiliary system
• Assembly, supply, mounting and installation of control and protection system
• Configuration and parametrization
• FAT and SAT tests
• Commissioning

Investor

Elektro Ljubljana d.d.; Slovenska cesta 58, 1000 Ljubljana, Slovenija

 

 

 

 

Wider area of Ivančna Gorica is currently supplied with electricity by 3 transmission lines from 110 kV Grosuplje. One of the transmission lines is used by companies Akrapovič and Livar while the other two supply remaining consumption of the distribution substation Ivančna Gorica. Because of frequent fluctuations and low quality of electricity due to the overload the economy and the population are suffering. In order to provide the population and the economy with appropriate conditions for further development, Elektro Ljubljana d.d. decided to invest in a much-needed new distribution transformer substation in Ivančna Gorica. The construction of the new substation began in 2018, launch and the usage start are predicted for December 2020.