SS 110/20 kV Ivančna Gorica

Distribution cilities

Construction of new distribution transformer substation in Ivančna Gorica

SS 110/20 kV Ivančna Gorica

Scope of work:

• Construction works
• Supply of primary equipment
• Electrical installation works
• Assmebly, supply, mounting and instalaltion of secondary equipment cabinets for 110 kV and 20 kV switchyards
• Supply of auxiliary system
• Assembly, supply, mounting and installation of control and protection system
• Configuration and parametrization
• FAT and SAT tests
• Commissioning 

 

 

 

Wider area of Ivančna Gorica was supplied with electricity by 3 transmission lines from 110 kV Grosuplje. One of the transmission lines was used by companies Akrapovič and Livar while the other two supplied remaining consumption of the distribution substation Ivančna Gorica. Because of frequent fluctuations and low quality of electricity due to the overload the economy and the population were suffering. In order to provide the population and the economy with appropriate conditions for further development, Elektro Ljubljana d.d. decided to invest in a much-needed new distribution transformer substation in Ivančna Gorica. The construction of the new substation began in 2018, launch and the usage start were in December 2020.

Implementation year: 2020 

Investor:

Elektro Ljubljana d.d. Slovenska cesta 58, 1000 Ljubljana, Slovenija

Ne spreglej


Back
Share on social networks: