Combined heat and power plant in Ljubljana

Combined heat and power plant in Ljubljana

Combined heat and power plant in Ljubljana

GIS switchyard in combined heat and power plant (CHP) Ljubljana

Implementation year

2019 

 

Scope of work
  • Supply and installation of 110 kV GIS switchyard
  • Assembly, supply and installation of secondary equipment such as FAT and SAT tests
  • secondary equipment for control and protection
  • FAT and SAT tests
  • Commisioning
Investor

SODO d.o.o.; Minarikova ulica 5, 2000 Maribor, Slovenija

 

 

 

 In January 2019 we, as a leading contractor, signed a contract with investor SODO for the project ''Supply and installation of 110 kV GIS switchyard, secondary equipment for control and protection of the GIS switchyard and GIS cable lugs''.