SS 110/20 kV Radovljica

Distribution facilities

Erection of new SS 110/20 kV Radovljica

SS 110/20 kV Radovljica

Scope of work:

  • Assembly, supply, mounting and installation of secondary equipment for 110 kV GIS switchyard
  • Assembly, supply, mounting and installation of auxiliary system cabinet
  • Project documentation preparation
  • Configuration and parametrization of the control and protection system
  • FAT and SAT tests
  • Commissioning

 

 

 

The old distribution transformer substation in Radovljica was built in 1978 and was just before the renovation already 40 years old and due to its age on the edge of its lifetime. Elektro Gorenjska company therefore invested in a new distribution transformer substation which supplies the population and the economy with more reliable electricity of better quality since 2018. It enables further development and growth of economy and turism.

The new substation comprises of a new building, new 110 kV GIS switchyard and new secondary and other equipment. Our team supplied and installed the GIS's secondary system, provided auxiliary system, project documentation, configuration and parametrization of the control and protection system, FAT and SAT tests and commissioning.

Implementation year: 2018

Investor:

Elektro Gorenjska d.d. Ulica Mirka Vadnova 3a, 4000 Kranj, Slovenija

 